Greece - Thessaloniki

 

Waste water treatment plant Thessaloniki


Characteristics:

  • Extension size 1,333,000 PE
  • Dry weather influx 16,200 m³/h
  • Mixed water influx 24,800 m³/h

Scope of Work:

  • Participation in offer preparation
  • Elaboration of explanation report
  • Hydraulic calculations
  • Elaboration of draft
  • Drawings

Description:

For the tender of the extension of the waste water treatment plant Thessaloniki the planing concept had to be remodelled and documents for the offer had to be created. Offered was the extension for the second development step. Another third extension step has been considered and described.

The waste water treatment plant Thessaloniki is a one-step activated sludge plant with anaerobe sludge stabilisation. For the mechanic step coarse rack, aired grit, grease chamber and a pre-sedimentation were offered. For the biological step activated sludge tanks with a total volume of 140,000 m³ and final sedimentation tanks were planned. To aerate the activated sludge tanks air diffusion is used. The plant is calculated on nutrient elimination. Pre-connected denitrification was planned for the nitrogen elimination. For the sewage sludge treatment static, septic tanks and filter belt presses were planned.


Client / Operator:

Hans Brochier GmbH & Co. KG
Department for water-
and sewage technique
Postfach 439
D - 63723 Aschaffenburg (Germany)


Contact:

Mister Huth
Phone: ++49 - 9 11 - 95 43 201

greece

System sections of the first extension level of the waste water treatment plant Thessaloniki

   